General and electrical contractors who need it on site on time. Gage supplies temporary power, the permanent service, and everything between, quoted from the takeoff and delivered by phase.

A construction site needs power before the building exists and permanent service before it opens. These are the six places the material matters most between the two.
Portable power cable, temporary enclosures, and worklights for the site during construction.
Pad-mounted transformers, metering enclosures, and switchgear for the finished building.
Conduit, duct, wireway, enclosures, and fittings staged by phase.
Barricade tape, barriers, traffic signage, cones, and lockout/tagout for a site that changes every week.
PPE, fall protection, spill control, first aid, and safety signage for every trade on site.
What a construction bill of materials usually covers by category. Send the takeoff in any form and we'll quote it as one list.
| Temporary power | Portable power cable, temporary enclosures, worklights |
|---|---|
| Service | Pad-mounted transformer, metering, switchgear |
| Cable | Feeders, branch wire, control cable, grounding |
| Raceway | Conduit, duct, wireway, enclosures, fittings |
| Lighting | Interior, area, and site fixtures |
| Safety | PPE, fall protection, spill control, first aid, signage |
| Site control | Barricades, traffic signage, cones, lockout/tagout |
| Delivery | Phased to the site as the schedule moves, nationwide |
The same four things we bring to every project, applied to a site where the schedule moves every week.