Federal, state, and municipal work to the letter of the spec. Gage supplies the service, distribution, cable, lighting, and safety material for public buildings, utilities, and infrastructure, with the submittal documents the contract requires.

Public work is defined by the specification and the submittal. The material is familiar; the paperwork and the delivery dates are where projects are won or lost.
Transformers and switchgear for public buildings, treatment plants, and municipal utilities, to the specified manufacturer or an approved equal.
Reclosers, air-break switches, and instrument transformers for municipal distribution.
Wire, cable, conduit, and enclosures to the spec sections, with the certifications attached.
Barricades, traffic signage, cones, and lockout/tagout for work in the public right of way.
What a public-sector bill of materials usually covers by category. Send the spec and the schedule and we'll quote it as one list, with submittals.
| Service | Transformers, metering enclosures, service entrance |
|---|---|
| Distribution | Switchgear, reclosers, air-break switches, regulators |
| Cable | Power, control, and grounding cable to spec |
| Raceway | Conduit, duct, wireway, enclosures, fittings |
| Lighting | Roadway, area, and facility fixtures |
| Safety | PPE, fall protection, spill control, first aid |
| Site control | Barricades, traffic signage, cones, lockout/tagout |
| Documents | Spec sheets, certifications, and submittals with every quote |
The same four things we bring to every project, applied to work where the submittal is as important as the material.